St. Francis Hospital
•
2020
Carlisle Construction was hired by St. Francis Hospital in Columbus, GA for the replacement of the existing equipment in their Nuclear Medicine Unit. The Scope of Work included: Demolition of the ceiling, floors, anchor bolts, existing mechanical and electrical; Install new HVAC Package including Plumbing and Mechanical GAS; Install New Trane DOAS-1 & Trane Tracer BAS Control Systems for standalone operation of HVAC System; Retrofit Existing Fire Suppression system; Install New Electrical Package; New Manington Bio-Spec Sheet Heat-Treated Welded Flooring w/ Flashed Coverings; Drywall Patch back; New Drywall Ceiling; Painting of all interior walls.